Optimized and custom-made hydro turbines for small to medium hydro power plants, both on and off the grid.
HPP is working to make it easier for people in very remote places, especially in Africa, to get energy. This solution is an improved hydro turbine for rural electrification. It provides a reliable, stable, and guaranteed source of electricity from a rene
Positive facts about Optimized hydro turbines for rural electrification
Life expectancy of more than 50 years with very low operating and maintenance costs
An hydro power plant of 1 MW can supply 500 households in electricity in Africa
100% recyclable
Payback time is between 3 to 10 years depending on the complexity of the project
The cost of each kWh produced via hydroelectricity is 5 to 10 times cheaper than fossil fuels
Optimized hydro turbines for rural electrification website : https://hydropowerplant.com